A TCS is required when a wall needs to be consecutively built upward. It is a climbing system for one side face walls of building walls using an integrated form and support system without staging.
It is applied mainly to open sections of architecture, large bridges or dock construction.
 
1. Reduction of material and labor costs due to no need for system supports and separate working platforms (B/T).
2. Safety is secured because there is no work at high levels.
3. Integrated form and support system substantially reduce work hours because the set can be moved and installed.
4. Less loss of materials. Clean sites.