The table form is a large beam system devised to install integrated joists, sleepers and floor slabs by vertical and horizontal movement and assembly. Since slab form is installed, dismantled, lifted and reinstalled using equipment, the table form can shorten the time needed for work and reduce labor costs. Table forms are mainly used to reduce the length of work needed for skyscrapers.
 
1. Reduction of work period enabling 3-day completion and simplification of work process.
2. Good quality due to factory manufacturing. The length of time needed for form installation can be adjusted without respect to yard availability on site.
3. Less noise and no loss of materials due to durability of materials.
4. Less labor. Reduction of work hours.
5. Clean site due to no accessories or materials.
6. Table form materials can be reused after completion of work.
 
 
 
 
     
< Table form with integrated beam slab >   < Slab table form >
     
 
     
< Euro form table form >   < Profile joint >
     
 
     
< Traditional slab table form >   < Traditional beam table form >
 
 
 
Move electronic forklift and lifting device under table form. Drop to a designated height. Move by electronic forklift.
 
Place table form on lifting rail. Push out of building and lift to higher floor for installation.
 
Place table form at designate position. Support staging under table form. Place form on joint to complete beam and slab form.